Team Utah Commercial Real Estate
REMAX Associates
Nobody Markets Commercial
Property the Way We Do.

Robert Farnsworth  801-898-8810

Randy Cummins  801-641-8004

Stockton Farnsworth  801-664-3370

Back to Home Back to Tools

Commercial Due Diligence Checklist

Protect your investment with a comprehensive due diligence process. Track every critical step from environmental review to lease analysis before closing on your next commercial property.

Overall Progress

0%
Environmental
0 / 5
Legal & Title
Zoning & Permits
0 / 4
Physical Inspection
0 / 5
Financial Analysis
0 / 5
Tenant & Lease
0 / 4
Set a date
Est. Due Diligence Cost (checked items)
$0
Cost ranges are rough ballpark guesses for planning, not quotes. Actual costs vary by property size, complexity, and provider.

Due Diligence Items

Environmental 0/5

Reviews historical property use, regulatory records, and site conditions to identify potential environmental contamination risks.
$2,000 - $3,500
Involves soil, groundwater, or building material sampling to confirm or rule out contamination flagged in Phase I.
$5,000 - $15,000
Recommended for older buildings. EPA and Utah air-quality rules generally require an asbestos inspection before renovation or demolition. Identifies hazardous materials that may need abatement.
$500 - $2,000
Checks for registered or abandoned USTs on the property that could pose contamination liability.
$300 - $800
Reviews DEQ records and prior reports for any known soil contamination issues on or near the property.
$200 - $500
Confirms the property's current zoning designation and whether the intended use is permitted, conditional, or would need a rezone (Utah cities can't grant a variance for a use).
$200 - $500
Verifies the planned business use is allowed under the zoning code, including parking requirements and signage.
$100 - $300
Reviews whether the building meets current building codes or has been grandfathered under previous standards.
$300 - $1,000
Ensures a valid C/O exists for the property's current use and verifies any conditional requirements are met.
$0 - $200
Evaluates foundation, walls, columns, and load-bearing elements for cracks, settling, or structural deficiencies.
$2,000 - $5,000
Assesses roof condition, remaining useful life, existing warranties, and estimates replacement cost if needed.
$500 - $1,500
Reviews heating, cooling, and ventilation systems for age, condition, efficiency, and deferred maintenance.
$300 - $1,000
Checks electrical capacity, panel condition, wiring, plumbing age, water pressure, and sewer line condition.
$300 - $1,000
Evaluates accessibility including ramps, doorways, restrooms, parking, and signage for Americans with Disabilities Act compliance.
$500 - $2,000
Cross-references the rent roll against actual leases to confirm tenants, rates, terms, and payment history.
$500 - $2,000
Analyzes three years of operating statements to identify trends, anomalies, and deferred maintenance patterns.
$1,000 - $3,000
Assesses the financial strength and payment reliability of major tenants to gauge income stability risk.
$200 - $500
Reviews current assessed value and tax rate. Utah counties value property every year at fair market value as of January 1, so budget for the assessment to change.
$200 - $500
Obtains insurance quotes and reviews current coverage to identify gaps, exclusions, and potential cost changes.
$300 - $800
Summarizes key terms from each lease: rent, term, options, escalations, expense stops, and special provisions.
$500 - $2,000
Written tenant confirmation of lease terms, rent amounts, deposits, and any landlord obligations or disputes.
$0 - $500
Confirms all security deposits are accounted for and will be properly transferred to the new owner at closing.
$0 - $200
Maps all lease expirations to identify rollover risk, renewal probability, and re-leasing exposure windows.
$200 - $500

Example Due Diligence Timeline

An example only. The deadlines in your purchase contract are the ones that count.

Inspections

Physical inspections, structural assessment, environmental Phase I ordering

Week 1-2

Environmental

Phase I results, Phase II if needed, environmental clearance review

Week 2-3

Financial & Legal

Rent roll audit, title review, lease abstracts, zoning confirmation

Week 3-4

Final Review

Estoppels, final walkthroughs, contingency resolution, closing preparation

Week 4-5

Get a printable version or export your current checklist state as a text summary

Need Due Diligence Help?

Our team helps buyers organize due diligence for commercial purchases throughout Utah.

Prefer to call? Reach Robert directly at 801-898-8810

Important Disclaimer — Please Read

This page and any tool, calculator, estimate, checklist, guide or data on it are provided by Team Utah Commercial, brokered by REMAX Associates, for general informational and educational purposes only. By using this page you agree to the terms below.

Team Utah Commercial · REMAX Associates · Each Office Independently Owned and Operated · Equal Housing Opportunity.